Back to Project Portfolio & Missions
Bahar Athletic Complex Industrial Control Switchboard
Custom-engineered control panel driving 25 single-phase motors, 5 heavy three-phase motors, and HVAC systems.
Project Overview
Engineering and assembly of a central control and motor starter switchboard automating air handlers, lighting, and heavy drive motors across the Bahar Sports Complex.
Engineering Scope
- Power circuitry managing 25 single-phase motors and 5 three-phase industrial motors
- Centralized control for HVAC units, ventilation fans, and stadium audio arrays
- Automated facade architectural lighting controls
- Designed, wired, and fully tested within 10 operational business days

