Power Transmission Reinforcement from Central 63kV Substation
Installation of 6.5 km overhead transmission line (3×120+35 mm²) resolving voltage drops for residential sectors.
Project Overview
This utility grid reinforcement eliminated severe regional voltage drops and restored power quality across suburban districts fed by the 63kV Central Substation.
Scope of Execution
- Conductor stringing across 6.5 km utilizing 3×120+35 mm² aerial cables
- Reinforcement of concrete poles and mounting of specialized high-grade utility fittings
- Successfully commissioned in 35 business days despite harsh seasonal weather