CNG Headquarters Passive & Active Network Infrastructure
Structured cabling deployment with 240 network nodes, Cat6 cabling, Fluke testing, and Layer 3 Cisco switch configurations.
Project Overview
Design and deployment of active and passive data communications across a two-story facility at the Kermanshah Oil Operations Complex.
Technical Specifications
- Termination of 240 network drops using over 4,200 meters of Cat6 cabling
- Surface containment utilizing specialized size-10 trunking systems
- Complete Fluke certification testing on all channel connections
- Layer 3 Cisco core switch configuration, routing tables, and VLAN separation