Rural MV/LV Distribution Grid Overhaul
Complete reconstruction of rural power grids across three villages featuring 107 concrete poles and 11 km aerial bundled cable.
Project Overview
Overhauling medium and low-voltage electrical lines across three rural communities, replacing bare aluminum wires with modern aerial bundled cables to reduce transmission losses.
Technical Execution
- Placement of 107 concrete utility poles and 2 steel light structures
- Mounting and activation of 5 distribution transformers (25 & 50 kVAR) with custom panels
- Stringing of 11 kilometers of aerial bundled cables (ABC)
- Delivered 7 days ahead of contracted schedule